Low GraphicsFri., Jul 4, 2008Contact UsSiteMapSearch
City of Mountain View Home
Homepage ... | Community Development | Building Inspection | Fast Track Plan Checks
Building and Fire Codes
Building FAQ's
Duplication of Plans
E-Permitting
Fast Track Plan Checks
Fax Permits
Building Permit Handouts
Hazardous Materials Information
Fire Handouts
New Address Request Procedure
Plancheck Requirements and Schedules
Professional Design Limitations
Special Inspections and Testing
Submitting for Building Permits
Work Exempted from Permit


E-mail story
Print friendly format

Fast Track Plan Checks

The City of Mountain View's Fast Track Plan Check program is designed to expedite the turn-around time for simple commercial interior plans to 5 working days.

Qualifying plans must be submitted to the Building Inspection Division between 8 a.m. and 4 p.m. no later than Tuesday afternoon in order for that plan check to be processed by the following Monday. You will be able to call (650) 903-6313 after 1 p.m. the Friday following your submittal to inquire if your plans were approved or disapproved.

The following Monday, all the plans will be ready to be picked up at the Building Inspection Division counter.

Requirements for Submittal in the Fast Track Program

  1. The project must be a B occupancy (primary office use), less than 10,000 square feet in area and must be a previously improved tenant space.
  2. Title 24 State Energy documentation must be submitted as required by the California Building Code. Two sets of wet-signed documentation are required for each submittal.
  3. Three (3) sets of wet-signed (stamped and signed) by a State of California licensed architect or professional engineer.
  4. There can be no exterior modifications in these plans.
  5. No hazardous occupancies, assembly occupancies or lab areas with unqualified amounts and types of chemicals will be allowed.
  6. A process description letter is required when the project includes a use or process(es) other than an office or retail type use.
  7. No elaborate structural changes to the building or area being modified will be allowed (i.e. bearing walls, beams, footings, large HVAC roof equipment, etc.)
  8. If a second plan check is required, plans must be resubmitted by Tuesday afternoon in order for the recheck to be processed by the following Monday. All original plans and paperwork must accompany the resubmitted plans and documentation.

If you have questions regarding the applicability of the Fast Track Plan Check program, please call (650) 903-6313, between 8 am and 5 pm. The Building Division staff can assist in determining whether your project is qualified.